0

Dog Training Lead Long Leads Rope Nylon Floatable Long Reflective Recall Dog Training Rope with Comfortable Handle for Hiking Camping Walking (65FT/20M)

 
Be Safe - We Directly Ship From Country of Origin
 
BE SAFE
WE ONLY SOURCE
FROM OFFICIAL SUPPLIERS
 
From United Kingdom
To International
In 5-10 Days
US$19.99 shipping fees for any order
 
GRAND SELECTION

Think of it and most probably we have it among our grand selection of products!

 
AMAZING PRICES

Get ready for the amazing and best Supps prices ever!

 
FIXED RATE DELIVERY

Get your order anywhere on this planet within 5-10 days with a fixed rate of $19.99 (no matter the size of your order)

 

 

 
Dog Training Lead Long Leads Rope Nylon Floatable Long Reflective Recall Dog Training Rope with Comfortable Handle for Hiking Camping Walking (65FT/20M)




Regular Price: US$69.99

Special Price US$59.99

Availability: In stock


Supplier: Eyeleaf

Category: Pet Supplies Dogs Training & Behaviour Aids


Or instantly:
US$19.99 shipping fees for any order

Key Benefits

  • 🐕 Off-Leash Training — Long 65ft/20m lead provides extended wandering area and freedom, ideal for dog off-leash training, hiking, camping, and walking.
  • 🔄 Tangle-Free Design — 360-degree rotation zinc alloy hook prevents tangling while keeping the lead strong and rust-proof for secure fastening to harness or collar.
  • 💡 Reflective Safety — Highly reflective stitching maintains visibility after dark and in low-light conditions for safer outdoor use.
  • 🧵 Durable Nylon Construction — Extra durable wear-resistant nylon material provides total control while giving your dog freedom to move.
  • ✋ Padded EVA Handle — Soft and sturdy EVA handle provides comfortable grip during training and play.

Common Questions

What length is this dog lead?
The lead is 65 feet (20 meters) long.
What is the hook made from?
The hook is made from zinc alloy, which is rust-proof and features 360-degree rotation to prevent tangling.
Is this lead suitable for off-leash training?
Yes, the long lead is designed as a great choice for dog off-leash training, providing extended freedom while maintaining control.
How visible is this lead in low light?
The lead has highly reflective stitching that maintains high visibility after dark and in low-light conditions.
 
Be Safe - We Directly Ship From Country of Origin
 
BE SAFE
WE ONLY SOURCE
FROM OFFICIAL SUPPLIERS
 
From United Kingdom
To International
In 5-10 Days
US$19.99 shipping fees for any order
 
GRAND SELECTION

Think of it and most probably we have it among our grand selection of products!

 
AMAZING PRICES

Get ready for the amazing and best Supps prices ever!

 
FIXED RATE DELIVERY

Get your order anywhere on this planet within 5-10 days with a fixed rate of $19.99 (no matter the size of your order)

 

 

 
Verified Customers Reviews
My Cart
Item
Continue Shopping