0

COMSLE Long Leads for Dog Training 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor 3m/10ft Black

 
Be Safe - We Directly Ship From Country of Origin
 
BE SAFE
WE ONLY SOURCE
FROM OFFICIAL SUPPLIERS
 
From United Kingdom
To International
In 5-10 Days
US$19.99 Shipping Fees for any Order
 

GRAND SELECTION

Think of it and most probably we have it among our grand selection of products!

 

AMAZING PRICES

Get ready for the amazing and best Supps prices ever!

 

FIXED RATE DELIVERY

Get your order anywhere on this planet within 5-10 days with a fixed rate of $19.99 (no matter the size of your order)

 

 

 

COMSLE Long Leads for Dog Training 1.5m/3m/5m Strong Extra Long Line Dogs Lead with Handle Light Nylon Puppy Training Lead Dog Leash for Pet Recall Tracking Obedience Camping Play Outdoor 3m/10ft Black





Regular Price: US$45.99

Special Price US$39.99

Availability: In stock


Supplier: COMSLE

Category: Pet Supplies Dogs Training & Behaviour Aids


Or instantly:

11
11
11
11
11
11
11


?Widely Usable?: The recall training lead can make the dog run freely, and teach your dog to recall and train obedience tracking. It can be controlled by the strong lead rope when walking in public places. It is suitable for large, medium and small dogs, very suitable for hiking, camping, training, hunting, backyard, beach, outdoor sports or swimming. ?Metal Rotating Buckle?: The long dog training leash has a rotating buckle, which is easy to hook, no tangles, and is durable. The sturdy hook can be rotated 360° and can be easily fixed to the dog's collar, ensuring that the pet can walk or run and play in any direction. Also hope that you can regularly check the usage of the hook. ?Extra Freedom?: Dogs often inadvertently run long distances or cross the road. Long leads for dog training can provide extra freedom. Dog training lead can leave a certain space between the dog and the owner, and they can also walk freely. You can step on the lead rope to ensure safety when necessary. Choose the length you need, which is very suitable for daily walking, running, training and other outdoor sports. ?Nylon Ttraining Lead?: The leash is strong and made of nylon material, this long training lead is durable and heavy duty, easy to wear and remove. The length of the leash line can allow the dog to wander and ensure that your order is issued. Long line for dogs provides a perfect balance between control and the dog's freedom, and is not elastic, allowing you and your dog to walk or run within a good distance. ?More Choices?: Width: 2cm,there are three sizes to choose from: 1.5m / 5ft, 3m / 10ft, 5m / 16.5ft. In addition, the long line lead is mainly mixed with two colors, and there are four colors to choose from to meet different hobbies. The shorter lead can be used for daily walking, and the longer can be subject to training, which is suitable for teaching dog recall or long-distance walking.
 
Be Safe - We Directly Ship From Country of Origin
 
BE SAFE
WE ONLY SOURCE
FROM OFFICIAL SUPPLIERS
 
From United Kingdom
To International
In 5-10 Days
US$19.99 Shipping Fees for any Order
 

GRAND SELECTION

Think of it and most probably we have it among our grand selection of products!

 

AMAZING PRICES

Get ready for the amazing and best Supps prices ever!

 

FIXED RATE DELIVERY

Get your order anywhere on this planet within 5-10 days with a fixed rate of $19.99 (no matter the size of your order)

 

 

 
Verified Customers Reviews
My Cart
Item
Continue Shopping